Alderon Iron Ore Corp. is pleased to announce that it has commenced preliminary work for the Pointe-Noire Terminal facility at the port of Sept-Îles, Quebec.  This is the product handling facility for the Kami Iron Ore Project (“Kami Project”) with mining and processing facilities located in western Labrador. The Kami Project is held by the Company’s affiliate The Kami Mine Limited Partnership (“Kami LP”).

Site preparations have commenced at the terminal facility, which will be built for receiving, unloading, stockpiling and reclaiming concentrate for ship loading.  The terminal facility will consist of a railcar unloading stub track, a single rotary car dumper, a concentrate storage yard with stacker-reclaimer and interconnecting conveyor systems.  Two of the most critical pieces of the material handling system for the Kami Project, the car dumper and the stacker-reclaimer, have already been ordered. 

“After a tremendous amount of hard work from the entire Alderon team, we are very excited to have commenced with the first step in preparation for construction for the Kami Project,” says Tayfun Eldem, President and CEO. “This step marks the continuation of a very successful start to the year and we look forward to hitting many more milestones in the next six months.”

Progress on the new multi-user dock by the Port of Sept-Îles is progressing with construction scheduled to wrap up during the summer of 2014. The new dock will provide ship-loading services to the Kami LP for up to 8 million tonnes of iron ore annually as per the agreement with Port of Sept-Îles. 

Alderon is a leading iron ore development company in Canada with offices in Montreal, Vancouver, St. John’s and Labrador City.  The Kami Project, owned 75 per cent by Alderon and 25 per cent by China-based Hebei Iron & Steel Group Co. Ltd. (“HBIS”) through The Kami Mine Limited Partnership, is located within Canada’s premier iron ore district and is surrounded by four producing iron ore mines. Its port handling facilities are located in Sept-Îles, the leading iron ore port in North America. The Alderon team is comprised of skilled professionals with significant iron ore expertise to advance Kami towards production. HBIS is Alderon’s strategic partner in the development of the Kami Project and China’s largest steel producer.